Shed Progress

Given the rainy weather of late, we’ve made remarkable progress on the new garden shed.

The clouds really came in that day. No view to speak of.

Below you can see the shed as viewed from under the cover of the first tool shed. The white pipe going over the top of the tank is directly from the rain gutter of the tool shed/work patio.

Framed opening of the french doors with view beyond.

Downspout feeding a pipe that will redirect rainwater from this roof to the tank

Interior temporary shop for the carpenters to work and shelter in.

Next to go in is the flooring (which is on top of the outdoor ‘bathtub’.)

The french door opening with the post railings installed and ready to paint.

Privacy wall posts. The yellow level on the left is the general location of the outdoor shower.

Most of the trim is on. Eventually I will clad the whole building in charred pallet wood. (Shou Sugi Ban) The plywood is there because it was quick to install. I can take my time with the siding.

This week I hope to receive delivery on my doors. Certain things take a long time to get here.

Here’s an example of the Shou Sugi Ban.

Some are even darker, like this one: