December Update

They guys have been beavering away at the foundation fiddly bits. Mounting brackets, placing rebar, vapor barrier, grounding wires etc.

Plumber came and did the waste runs to the septic. (3 black pipes plus clean out)

Vapor barrier down and the rebar mesh starting to go in.

While the guys are working on the foundation, I’m building boxes with scraps and pallet wood to house a row of vetiver grass for slowing down the water run off. This is a particularly challenging section of the yard with lots of hidden rocks. My plan is to repurpose a lot of the timber from the foundation forms and make a collection of boxes built into the hillside. Probably populated with succulents.

Here’s a time-lapse of the guys putting in the rebar.